Forel
Electrical materials distribution · Fasano (BR) · Puglia
From a manual warehouse with 14,000 SKUs to a fully automated intralogistics 4.0 facility — delivered turnkey by Key4 as EPC General Contractor.
The client
Forel S.r.l. is a wholesale and retail distributor of electrical materials, lighting, industrial automation, HVAC systems and renewable energy, founded in 1979 in Fasano (BR), Puglia.
A member of the national Fegime Italia network, Forel serves installers, designers and industrial and commercial companies through 4 trade counters and a regional agent network. With over 40 years of activity and an assortment of approximately 14,000 SKUs, Forel needed to radically modernise its logistics infrastructure to support growth without compromising service quality.
The challenge
The Key4 solution
Key4 took on the role of EPC General Contractor (Engineering, Procurement, Construction), coordinating six specialist partners and delivering the entire transformation turnkey.
The project in action
Forel automated warehouse
AutoStore robots and carriers operating in the new intralogistics facility
Forel case study presentation
Key4 presents the Forel project: intralogistics 4.0 with AutoStore, AGVs and automatic cable unwinder
Results
Project consortium
Technologies & systems
Facing a similar logistics challenge?
We design and build turnkey intralogistics facilities — from layout analysis to automated systems commissioning. Tell us about your warehouse.